Recent Projects
- user warning: Table 'itccjoco_itccnewdb.node_gallery_relationships' doesn't exist query: SELECT rid, gallery_type, image_type, imagefield_name, settings from node_gallery_relationships in /home4/itccjoco/public_html/itccjo/sites/all/modules/node_gallery/node_gallery.inc on line 116.
- strict warning: Non-static method view::load() should not be called statically in /home4/itccjoco/public_html/itccjo/sites/all/modules/views/views.module on line 906.
- strict warning: Declaration of views_handler_filter::options_validate() should be compatible with views_handler::options_validate($form, &$form_state) in /home4/itccjoco/public_html/itccjo/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
- strict warning: Declaration of views_handler_filter::options_submit() should be compatible with views_handler::options_submit($form, &$form_state) in /home4/itccjoco/public_html/itccjo/sites/all/modules/views/handlers/views_handler_filter.inc on line 0.
- strict warning: Declaration of views_plugin_style_default::options() should be compatible with views_object::options() in /home4/itccjoco/public_html/itccjo/sites/all/modules/views/plugins/views_plugin_style_default.inc on line 0.
- strict warning: Declaration of views_plugin_row::options_validate() should be compatible with views_plugin::options_validate(&$form, &$form_state) in /home4/itccjoco/public_html/itccjo/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.
- strict warning: Declaration of views_plugin_row::options_submit() should be compatible with views_plugin::options_submit(&$form, &$form_state) in /home4/itccjoco/public_html/itccjo/sites/all/modules/views/plugins/views_plugin_row.inc on line 0.
Below is a list of some of the recent prestigious projects that ITCC has taken part in as an Engineering and Procurement Service Provider.
DISI – Mudawarra To Amman Water Conveyance System Project
Brief Description : 325 Kms of Water Conveyance from 55 deep water wells. System Capacity 100 million m³/year of water for a period of 50 years service life of the project.
Client : DIWACO (Disi Water Company)
Main Contractor : Gama Power (Turkey)
Duration : 2010-2011
Scope of Work : Piping and Cathodic Protection Products & Services
Jordan Al-Qatrana IPP Project
Brief Description : Gas Combined Cycle Power Plant 400MW, Al Qatrana, Jordan
Client : Qatrana Electric Power Company
Main Contractor : Lotte Engineering & Construction CO.,LTD (Korea)
Duration : 2009-2011
Scope of Work : Piping and Electrical Products
APC New Brine Intake Pumping Station at the Dead Sea
Brief Description : Supply and erection of Structural Steel Jetty with Timber, Installation, pre-commissioning, assistance in testing and assistance in commissioning of pumps with motors, valves, power pack and related hydraulic piping and controls.
Client : The Arab Potash Company
Main Contractor : Sener Arda Insaat (Turkey)
Duration : 2008-2010
Scope of Work : Mechanical and Piping Engineering, Procurement and Installation Services.
APC Plant Optimization and Production Expansion Project
Brief Description : Construction of a New Cold Crystallization Plant to boost Potash Production capacity from 2 million tons to 2.5 million tons per year.
Client : The Arab Potash Company
Main Contractor : Petrojet (Egypt)
Duration : 2007-2009
Scope of Work : Mechanical and Piping Engineering, Procurement and Installation Services.
Amman East 400 KV Substation
Brief Description : Supply of Switchgear, Ancillary Equipment and Civil works for Amman East 400 KV AIS Substation.
Client : National Electric Power Company (NEPCO)
Main Contractor : Control y Montajes Industriales CYMI, S.A. (Spain)
Duration : 2006-2008
Scope of Work : Supply of MV Cables and Accessories,