As part of the project, ITCC supplied critical pipeline materials, including pipes, fittings, flanges, bolts, cathodic protection systems, and other essential components that were instrumental to the successful execution and long-term integrity of the conveyance system.
The DISI Water Conveyance System extends over 325 kilometers, transporting water from 55 deep groundwater wells in Mudawarra to the capital, Amman. Designed for a 50-year service life, the system delivers a capacity of 100 million cubic meters of water per year, playing a vital role in ensuring sustainable water supply.
ITCC’s contribution reflects its capability to support large-scale, long-life infrastructure projects through the supply of engineered systems and materials that meet stringent durability, corrosion protection, and performance requirements.